Select Page

  in Mandalay Myanmar  sales   price   shop   near me   near me shop   factory   supplier 3ton Loader with Optional Pallet Fork manufacturer   best   Cost   Custom   Cheap   wholesaler

We will provide greatest companies and large good quality items with all sincerity. We offer OEM service. Our technicians and engineers have 23 several years of Expertise in the Bearing Business. CE 3ton Entrance Wheel LoaEPTwith 2cbm Shovel

Keywords and phrases colon Wheel Loader comma entrance loader comma loaEPTfor sale comma wheel loaEPT3ton

Our advantages colon

-We create most of the parts in our own manufacturing facility comma much better to manage the good quality comma easier to get elements in the EPT
-Real guarantee for quality colon we will give areas as free of charge within guarantee if quality problem
-EPT encounters in this marketplace colon we commenced to exporting loaders from calendar year 2008 period of time

Characteristics of this model 3ton loader colon

1 rpar The wheel loaEPTuses XiHu (West Lake) Dis.hu (West Lake) Dis.feng EPT motor with significantly less oil consumption comma minimal sounds and little emissions interval
2 rpar EPT and torque converter of 5 ton wheel loaEPTare of excellent applicability period
three rpar Optimally created functioning gadget and frames of wheel loaEPTare more powerful and far more resilient interval
four rpar EPT responsibility unloading EPT system improves the EPT wheel loaEPTperformance interval
5 rpar The wheel loaEPTuses best EPT cylinders comma pumps and valve interval

Details colon

1 rpar EPT motor comma 130HP comma 6 cylinders comma 4 strokes comma drinking water cooling comma turbocharged comma EPT guarantee interval ZL50 planetary variety EPT with EPT converter comma 2 EPT and 1 reverse speeds comma exact same as 5ton wheel loader comma stronger for heavy responsibility period of time EPT EPT change interval EPT axles with caliper sort services brake period of time

two rpar The robotically welded two-piece structural body design and style supplies a rugged and reputable foundation for the EPT that enhances steadiness comma overall performance comma and serviceability interval A robust articulating hitch system joins the front and rear frames enhancing longevity time period Enhanced line routings across the hitch joint streamline the producing approach and improve trustworthiness and longevity time period

3 rpar EPT structural components are all developed by EPT period of time All the areas are substantial high quality welded time period The ball blasting and vibration therapy can release the welding stress interval UT lparEPT Screening rpar to examine the welding defect period It will type a good deal of modest pits on the surface area following blasting and it will improve the paint adhesion interval

four rpar The sturdy axle makes use of a major EPT and two hub EPTs which are linked by two shafts period of time The major EPT utilizes EPTl EPTs and the hub EPT uses planet EPTs period Dry kind caliper brake uses a brake shoe with a brake disc interval It is greater for maintenance and radiation period of time

five rpar The radiating area of the high top quality radiator is added for greater radiation period of time The temperature of the engine and the EPT can be controlled unEPTthe temperature limitations period It extends the service daily life both of the engine and the EPT period of time And it minimizes the oil leak of the hoses and meanwhile the provider existence of hoses is extended as well period

6 rpar Luxury cabin is outfitted the two air conditioner and electric powered supporter period Radio with SD card interface is stXiHu (West Lake) Dis.Hu (West Lake) Dis.rd time period The roomy cabin assures the relaxed operation and rest surroundings for the operators period

7 rpar One EPT EPTstick manage is optional period The EPTstick can be moved EPT and again to control the growth lifting and down time period The EPTstick can be moved still left and rigEPT to management the bucket dumping and loading period of time It is effortless for operation and the efficiency is a lot higher than the two EPT control program period of time

8 rpar The steering wheel placement can be a little modified period The instrument panel consists the meter of h2o temperature comma the meter of oil temperature comma the meter of fuel amount comma the meter of air strain and the counter of functioning several hours time period The switches for lights are blended in the panel as well period

Optonal attachments
-coal bucket
-rock bucket
-quick alter hitch
-wood grapple
-grass grapple
-pallet fork

Loading and deal
-one device per 40HQ container or 2 units in a 40HQ and a 20GP containers
-disassembling cabin and bucket
-cabin in a steel body
-main human body EPTd into container immediately
-fixed with skilled metal ropes

Guarantee and servce colon

one rpar One calendar year guarantee for EPT EPT time period
2 rpar All spare parts are obtainable as we create most of the components in our factory period of time
3 rpar We can give technical help through mail comma phone comma video or sending engineers there time period
four rpar EPT operation and upkeep manul and areas listing are transported with the loaders period

Our products assortment colon

We create wheel loaders with bucket potential from 1 period8m3 to 3m3 time period
We also generate excavators from 1 period8ton to 42ton period
All EPTs are CE certificated period

Our manufacturing facility tour colon
We generate most of the components and it is much better for quality management program time period And it is easy to get the spare parts from us directly way too time period

Specs colon

Standard Knowledge
Bucket capability 1 period8 m sup3
Rated load 3200 kg
Operation fat 12440 kg
Dumping peak 3060 mm
Dumping get to 1008 mm
Breakout pressure 97 kN
Traction force a hundred kN
Wheel base 2750 mm
Whole EPT cycle time ten period3 s
Total bucket lifting time 5 period6 s
Min time period turning radius 5376 mm
All round dimension lparL timesW timesH rpar 6970 times2450 times3228 mm
Motor
Product CUMMINS 6BT5 period9-C130
Rated EPT 97 kw
Rated pace 2200 rpm
Max period of time torque 560 N periodm
Gas usage 225 g solkw periodh
EPT Technique
Gear box type planetary EPT shift
EPT velocity I twelve km solh
EPT pace II forty km solh
Reverse speed seventeen km solh
Torque converter sort one phase 4 components
Axle type 4-wheel EPT
Tire measurement 17 period5-25-12PR

  in Mandalay Myanmar  sales   price   shop   near me   near me shop   factory   supplier 3ton Loader with Optional Pallet Fork manufacturer   best   Cost   Custom   Cheap   wholesaler

  in Mandalay Myanmar  sales   price   shop   near me   near me shop   factory   supplier 3ton Loader with Optional Pallet Fork manufacturer   best   Cost   Custom   Cheap   wholesaler